PennDOT is alerting motorists to some changes in traffic patterns along Oakland Ave. in White Township later this week.
On June 16-17, crews will be painting lines in the currently closed lanes in preparation for some upcoming lane switches. Those switches will run from June 20-22 from 7 a.m. until 7 p.m.
Crews will also conduct line painting and moving signal heads at that time.
The changes are part of the $19.83 million Route 286/422 widening and resurfacing projects, which includes the widening of 286 and the 422 interchange, the replacement of the bridge over McCarthy Run, and the installation of sidewalks along 286. Additionally, drainage and guide rail upgrades, along with traffic signal replacements, are planned.
The project is estimated to be completed by December 2023, and motorists can check changing traffic patterns and delays using the 511PA mobile app.












Comments